-
Reduction of greenhouse gas emissions at the AIRBUS Rochefort site
Our role was to reduce GHG emissions at the AIRBUS site in Rochefort through a biomass boiler and geothermal solutions for improved energy efficiency.
-
Feasibility study for the implementation of a wood-fired district heating network
Discover the wood-fired district heating project: 8 GWh of energy delivered, 95% wood coverage, and reduced CO2 emissions.
-
Decarbonization study of 5 residences
We carried out a feasibility study for a heat pump or wood-fired boiler for Vilogia, including a comparative analysis with a gas scenario, costs, subsidies, and energy and environmental gains.
-
Feasibility study for the implementation of a heat pump or a wood-fired boiler
We carried out a feasibility study for a heat pump or wood-fired boiler for Vilogia, including a comparative analysis with a gas scenario, costs, subsidies, and energy and environmental gains.
-
Study of MGP opportunity & contract renewal & project management assistance for future urban heat network connection
Our goal was to conduct a preliminary and opportunity study for MGP, contract renewal P1P2P3, technical, legal, and financial support.
-
Contract renewal with energy performance clause
Our goal is to renew the existing contract with the Mont Saint Michel Hospital Group and bring it up to current standards.
-
Decarbonization of the University of Rennes Beaulieu
Our objective was to reduce GHG emissions at the University of Rennes Beaulieu with a 4 MW biomass heating plant or an innovative district heating network.
-
Refrigeration system installation and refurbishment of outdated facilities
Discover the energy optimization of the University of Rennes Beaulieu with a refrigeration plant and an innovative cooling network to reduce costs and improve efficiency.
-
Study and support for the implementation of a wood-fired boiler plant
Discover the wood-based district heating network project in Brive: 28 GWh of energy delivered, 90% from renewable and recovered energy sources, and a reduction of 10,000 tons of CO2 per year.
-
Project management for the monitoring and acceptance of the refurbishment works on distribution networks
We carried out project management for the monitoring and acceptance of the refurbishment works on the horizontal distribution networks of the Germain Dorel residence.