GHG reduction and implementation of a biomass boiler plant

  • Decarbonization
  • Industry
réduction GES chaufferie biomasse

AIRBUS

The client’s objectives and expectations

The client wants to reduce the site’s greenhouse gas (GHG) emissions.

Our main missions

This study aims to assess the feasibility of installing a biomass boiler plant and its sharing with the AIRBUS site in Saint-Nazaire.

Project specifications

The project involves the installation of a 6 MW biomass boiler plant and the creation of an interconnection network between the AIRBUS sites in Montoir and Saint-Nazaire.

Results obtained

Our project is competing with the district heating network proposed by the city of Saint-Nazaire. This situation requires a thorough evaluation of the advantages and disadvantages of each option to determine the most efficient and sustainable solution.

This project was very rewarding because it allowed us to compare several perspectives and aim for sharing resources between two AIRBUS group sites, as well as potentially with the city’s district heating network.

Thierry, Project Manager at Best Energies